Project Experience

FBE / 3LPP / 3LPE
No Project Title   Size Coating Quantity Client Year
1. Tangga Barat Cluster Development Project   24"
10" , 12"
Internal
FBE
52km
0.5km
PCSB June 2009 - July 2009
2. Gumust -Kakap Deepwater Project   8" , 10" , 12"
10" , 12"
FBE
3LPE
54.7km
3km
SSPC January 2009 - April 2009
3. Turkmenistan Block 1 Gas Development Project   4" 3LPE 81km MITCO/PCSB December 2008 - January 2009
4. Pearl Development Project   6" , 10" FBE & 3LPE 14km PCVL November 2008
5. Turkmenistan Block 1 Gas Development Project (for SPU coating)   12" FBE 15.1km MITCO/PCSB Sep 2008
6. DBNGP Stage 5B Expansion Project (18 metre long line pipe)   26” 3LPE & Internal 240km Metal One /
West Net Energy
Jun 2008 -
March 2009
7. Kumang Cluster Development Project   18” 3LPP 1km PCSB Jun 2008
8. SKO Pipeline Replacement Project   8”, 10” FBE 2km PCSB May 2008
9. SK309/311 Phase 1 Gas Development Project (Golok - West Patricia)   6”, 8”
 
FBE
 
41km
 
Murphy Oil
 
May 2008 –
August 2008
10. Gas Malaysia   4”, 6”, 8” 3LPE 60km GMSB Apr 2008 –
May 2008
11. Saderi Project (insulation coating – 22mm of 5LPP)   14” 5LPP 11.5km SSB Jan 2008 –
Mar 2008
12. PC4 Gas Development Project (insulation coating – 11mm of 3LPP)   12” 3LPP 26km PCSB Dec 2007 –
Jan 2008
13. Blacktip Project   18” 3LPE 33km Saipem Nov 2007 –
Jan 2008
14. Longtom Project   12” 3LPE 20km Sumitomo Sep 2007
15. In Salah Gas Project, Algeria (stainless steel line pipe – coating for high temperature)   6”, 8” 3LPP 15km BP Sep 2007
16. Kikeh Gas Pipeline Project   12”
12”
3LPE
FBE
42.2km
95.5km
SapuraAcergy
 
May 2007 –
17. Jerneh B – Jerneh A Pipeline Project (clad line pipe – coating for high temperature)   16” 3LPP 7km
 
EPMI
 
May 2007 –
Jul 2007
18. Tapis F – Guntong E Pipeline Project   18”
 
3LPP
 
21km
 
EPMI
 
Apr 2007 –
Jun 2007
19. In Salah Gas Project, Algeria (stainless steel line pipe – coating for high temperature)   8” 3LPP 9km BP Apr 2007
20. Sumandak Phase II   4”
8”, 10”,
12”, 16”
3LPE
FBE
 
5.5km
1km
 
PCSB
 
Apr 2007
 
21. Bumi, Bulan & Suriya Project (clad line pipe – coating for high temperature)   20”, 26” 3LPP 37.8km Kencana HL Feb 2007 – Apr 2007
22. F13E to F13W Linepipes and Bends Project (coating for high temperature)   20” 3LPP 6.4km Sarawak Shell Bhd. Jan-07
23. Taichung-Tungsiao-Tatan Project   36” 3LPE & Internal 48km CPC Dec 2006 – Feb 2007
24. DBNGP Stage 5A Expansion Project (18 metre long line pipe)   26” 3LPE & Internal 288km Metal One / Alinta Nov 2006 – Jul 2007
 